Situation: Sabadell
Client: Ajuntament de Sabadell
Construction: 2023
Area: 2.736,69 m2
Construction cost: 3.011.717,06 €
Team: Numatec S.L.

New Sabadell Music School and extension of the St. Oleguer civic center. The façade of the new block has a crystalline curtain wall designed with bioclimatic criteria that maximize the capture of solar energy. At the same time, the façade inspires a music score, where the horizontal crossbars are emphasized like a musical pentagram. Behind, the concrete trombe wall is rhythmically perforated, as if they were signs of pneumatic notation.